Can You Prove These Parts Were Good?
Certs live on a whiteboard, and audits take two weeks. For defense suppliers and regulated manufacturers, the audit question is always the same, and the answer is usually spread across binders, spreadsheets and email. The Lake MES Platform keeps the quality record, the document in force and the labor record with the job in SyteLine, so the evidence is there when your auditor or your prime asks for it.
1,000+ manufacturers served since 1983 | 650+ running Lake software today | Infor Gold Channel Partner
Compliance gaps in defense manufacturing don’t stay hidden.
Most manufacturers find their gaps during an audit, a contract review or a prime's supplier questionnaire. That's the moment when there's no time left to fix them.
Audit evidence takes weeks to assemble
When an auditor asks for every nonconformance on a part number and what you did about each one, most shops rebuild the answer from spreadsheets, email and paper travelers. That work lands on the quality manager, usually in the weeks before the audit.
The drawing at the station may not be the current one
If an operator builds from a drawing that was revised last week, the problem starts at the operation. You find out at inspection, or your customer finds it for you.
Corrective actions live outside the system
A corrective action tracked in a spreadsheet has no link to the job, the part or the engineering change that closed it. When the same defect comes back, nobody can show what was done the first time.
Flow-down requirements keep growing
Primes flow their quality requirements down to every tier, and each new contract adds to what you have to show. Every requirement you meet by hand is another binder to keep current.
From the document at the station to the corrective action that closes the loop
Each step below is a product on the Lake MES Platform. Your records stay in SyteLine, where your auditor can find them.
The right document at the operation
Doc-Trak attaches drawings, work instructions and certificates to the SyteLine record they belong to: the item, the job, the operation, the lot or the serial number. The drawing at the station is the one attached to the job. With setup, operators see only the current revision.
Labor and scrap recorded on the job
Shop-Trak runs alongside SyteLine. It posts labor, quantities and scrap with a reason code to the job as the work happens.
Nonconformance to corrective action to engineering change
Quality-Trak runs inside SyteLine. A nonconformance report (NCR) opens a corrective and preventive action (CAPA) when it needs one, and an engineering change order (ECO) carries the fix into the item and the routing. Document numbers are sequential and can't be keyed over. A record is voided, never deleted.
Audits, complaints and inspections on the record
Quality-Trak records internal audits, customer complaints and inspections (dimensional, torque, checklist, attribute and serial) on the same SyteLine database. Pareto analysis shows where defects cluster by cause and by risk category.
The evidence when it's asked for
Because the records are in SyteLine, the answer to an audit question comes from a Quality-Trak report or a SyteLine search. You don't have to rebuild it from binders.
Shop-Trak, Doc-Trak and Fact-Trak already work on your SyteLine data today. The next direct product-to-product integration, Shop-Trak and Machine-Trak, is expected by the end of 2026, with more through 2027.
Planned 2027: recording quality results from the Shop-Trak screen.
Your industry has a specific compliance lens. We know it.
Six regulated verticals, each with its own audit surface, flow-down requirements, and product fit.
The partner behind the platform
Each part of the problem has a product on the platform
Nonconformances, corrective actions, engineering changes, audits, complaints and inspections inside SyteLine
The drawing, work instruction or certificate attached to the job, operation, lot or serial
Labor and scrap Labor, quantities and scrap with a reason, posted to the job as the work happens | Shop-Trak
Any asset, connected: CNC, PLC-based or legacy. OEE and utilization, drillable to the reason behind each stop
What working with us looks like
We start with your audit cycle and your SyteLine setup, then propose a defined scope. We don't quote implementation timelines on a web page. We'd rather look at your operation first.
A 30-minute working session. We walk through your SyteLine version, the Lake products you run today, how you keep quality records and controlled documents, and what your prime or your audit cycle asks of you. We tell you what the platform will and won't do for your situation. If we're a fit, we propose a defined scope with named milestones. If we're not, we tell you that too.
If your work is subject to ITAR, or you run SyteLine in Infor's GovCloud, tell us at the start. We ask about ITAR and GovCloud requirements before a deployment model is chosen, so the products are installed where your contracts allow.
- Your SyteLine version and where it runs
- The Lake products you run today
- Where your quality records and controlled documents live today
- The requirements your primes flow down to you
- Contracts subject to ITAR or EAR controls
- Contacts for IT, operations, and quality
Real questions from defense and regulated manufacturers
No. You add platform products to the SyteLine you run today. Your account team will confirm what your version supports.
Standards like AS9100 and ISO 9001 certify your quality management system, not a piece of software. Quality-Trak records the nonconformances, corrective actions, engineering changes and internal audits those audits review.
Quality-Trak does not include gage calibration.
It changes where the products can be installed. We ask about ITAR and GovCloud requirements before a deployment model is chosen, and your account team plans the installation around them.
Ready to understand your actual compliance posture?
Part of the Lake MES Platform
SyteLine is your system of record. The Lake MES Platform is your system of execution. Shop-Trak, Doc-Trak and Fact-Trak already work on your SyteLine data today. The next direct product-to-product integration, Shop-Trak and Machine-Trak, is expected by the end of 2026, with more through 2027.